PoliticounterBETA

Public BETA · sources before assessment

Source fact ≠ proposed analytical connection ≠ independently reviewed assessment.

How it works

From a traceable source to an accountable reviewed conclusion — each step stays visible and separate.

  1. 1. Find the official source

    Programmes, transcripts, decisions and votes begin with an official source link. We record retrieval time and coverage limits.

  2. 2. Preserve originals and versions

    Original text is retained. A corrected transcript does not erase the earlier version; unedited or incomplete text is explicitly labelled.

  3. 3. Separate statements and actions

    A speech, an MP’s oath, a procedural turn, a bill and a vote are distinct records. Unclear speaker identity remains unresolved.

  4. 4. Propose a possible connection

    A relationship between a statement or parliamentary action and a programme commitment is a separate analytical proposal with a specific evidence span. It is not a fulfilment judgment.

  5. 5. People review assessments

    Independent assessment requires authenticated reviewers, reasons and governance. A proposal must never automatically become a reviewed assessment.

  6. 6. Return to the evidence

    Stable references, text versions and the Record Log make provenance traceable and analysis repeatable when evidence or methodology changes.

What works now?

The programme baseline, source links and logs are public. A separate private capture of 15th Saeima transcripts has begun; it is not yet a complete public parliamentary record. Analytical connections and independent assessments are inactive. MP biographies are published only after approval.

Sources · Methodology and about · Record Log

OFFICIAL FACTUAL RECORD

We begin with exact source text and provenance. Interpretation and review remain separate. A source establishes that a statement was published, not that the claim is true. Assessment requires reasons, evidence and accountable review.

PROPOSED CONNECTION

Parliamentary statements, transcript revisions, atoms and programme connections are not recorded in this snapshot. No log entries are invented for these events.

REVIEWED ASSESSMENT

Independent assessment is disabled pending authenticated reviewers and governance. There is no automatic fulfilled/broken scoring.